<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Test Equipment Connection &#187; FL</title>
	<atom:link href="http://blog.testequipmentconnection.com/tag/fl/feed" rel="self" type="application/rss+xml" />
	<link>http://blog.testequipmentconnection.com</link>
	<description>Quality refurbished test equipment</description>
	<lastBuildDate>Wed, 09 Mar 2022 14:42:21 +0000</lastBuildDate>
	<language>en-US</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=3.9.40</generator>
	<item>
		<title>Megger Best Practices Battery Maintenance and Substation Seminars</title>
		<link>http://blog.testequipmentconnection.com/megger-best-practices-battery-maintenance-and-substation-seminars</link>
		<comments>http://blog.testequipmentconnection.com/megger-best-practices-battery-maintenance-and-substation-seminars#comments</comments>
		<pubDate>Tue, 12 Oct 2010 21:09:53 +0000</pubDate>
		<dc:creator><![CDATA[Mike Novello]]></dc:creator>
				<category><![CDATA[Megger]]></category>
		<category><![CDATA[FL]]></category>
		<category><![CDATA[Florida]]></category>
		<category><![CDATA[Free]]></category>
		<category><![CDATA[FREE one-day seminars]]></category>
		<category><![CDATA[Georgia]]></category>
		<category><![CDATA[Kissimmee]]></category>
		<category><![CDATA[Megger Best Practices Battery Maintenance and Substation Seminars]]></category>
		<category><![CDATA[one-day]]></category>
		<category><![CDATA[Roswell]]></category>
		<category><![CDATA[Secondary batteries]]></category>
		<category><![CDATA[seminars]]></category>
		<category><![CDATA[substation maintenance]]></category>

		<guid isPermaLink="false">http://blog.testequipmentconnection.com/?p=1104</guid>
		<description><![CDATA[Free Megger Best Practices Battery Maintenance and Substation Seminars Megger Best Practices Battery Maintenance and Substation Seminars now in Atlanta, Georgia and Orlando, Florida Secondary batteries play an essential role in many areas of business and commerce, but to be &#8230; <a href="http://blog.testequipmentconnection.com/megger-best-practices-battery-maintenance-and-substation-seminars">Read More <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<h1><span class="MainFeatureHeader"><span style="font-size: medium;">Free Megger Best Practices Battery Maintenance and Substation Seminars</span></span></h1>
<p><img class="alignleft" style="border: 0pt none;" src="http://www.megger.com/common/images/SubstationSeminar.jpg" border="0" alt="" width="259" height="181" align="BOTTOM" /></p>
<h4 style="text-align: justify;"><span class="MainFeatureHeader">Megger Best Practices Battery Maintenance and Substation Seminars now in Atlanta, Georgia and Orlando, Florida</span></h4>
<p class="FeatureText" style="text-align: justify;">Secondary batteries play an essential role in many areas of business and commerce, but to be sure that they deliver their full performance when called upon to do so, regular testing is needed.</p>
<p class="FeatureText" style="text-align: justify;">
<p class="FeatureText" style="text-align: justify;">To learn more Megger is presenting <strong>FREE one-day seminars</strong> across the United States and recently we have added events in Georgia and Florida. The seminars address some of the most important and costly issues relating to battery and substation maintenance, and include extensive practical<br />
presentations.</p>
<p class="FeatureText" style="text-align: justify;">
<h3 style="text-align: justify;"><strong><span style="font-size: small;">Megger’s Best Practices Battery and Substation Seminars are being held at the following locations:</span></strong></p>
<p><strong>October 26th<br />
Holiday Inn Atlanta/Roswell<br />
909 Holcomb Bridge Rd.<br />
Roswell, Georgia 30076<br />
<a href="http://www.regonline.com/2010_megger_best_practices_cb_and_substation_semin">click here</a> to register</strong></p>
<p><strong>October 28th 2010<br />
Holiday Inn Main Gate<br />
5711 West U.S. Hwy 192<br />
Kissimmee, FL 34746<br />
<a href="http://www.regonline.com/2010_megger_best_practices_circuit_breaker_and_sub">click here</a> to register</strong></h3>
<p class="FeatureText" style="text-align: justify;"><strong>Focus</strong><br />
The key focus of the Best Practices Battery and Substation Seminar is condition analysis, and the assessment of power transformers. All sessions include show-and-tell demonstrations of practical techniques for maximizing reliability, including the most commonly used methods and practices.</p>
<p style="text-align: justify;">Among the topics covered in detail for circuit breakers are basic testing techniques, first trip testing, static and dynamic resistance measurements, vibration analysis, the formulation of test plans and reporting.</p>
<p style="text-align: justify;">For power transformers, recent advances in condition analysis and assessment are presented, complemented by discussion and demonstration of the most useful and convenient test techniques. These include power factor testing, sweep frequency response analysis (SFRA) and insulation diagnostic analyzer (IDAX) applications.</p>
<p style="text-align: justify;">Invaluable information is also provided on Battery Performance Testing and Reporting data collection, trending and analysis via PowerDB software, as well as insights into how companies are coping with the North American Electric Reliability Corporation (NERC) and Federal Energy Regulatory Commission (FERC) data collection and management requirements.</p>
<p style="text-align: justify;">Participants of this training seminar will improve business skills, share insights, and learn from Megger’s technology specialists as they share their expertise by addressing many of the challenges seen in the electric power industry today. Topics will highlight HV Circuit Breaker Testing and Condition Analysis, and Assessment of Power Transformers. Each session will include show and tell demonstrations on the practical aspects of ensuring reliability including common methods and practices.</p>
<p style="text-align: justify;">Sign up early as spaces are limited. Please contact Nicole Stokes at 214 330 3245 or email nicole.stokes@megger.com to register.</p>
<p class="FeatureText" style="text-align: justify;">(source  www.megger.com)</p>
<p class="FeatureText" style="text-align: justify;"><img class="alignnone" src="http://www.megger.com/common/images/MeggerLogo.gif" alt="" width="176" height="53" /></p>
<p class="FeatureText" style="text-align: justify;"><a href="http://www.testequipmentconnection.com/manufacturer/Megger"><span style="font-size: medium;">View and Purchase Megger Products HERE</span></a></p>
<p class="FeatureText" style="text-align: justify;"><span style="font-size: medium;"><br />
</span></p>
<!-- Start Shareaholic Recommendations Automatic --><!-- End Shareaholic Recommendations Automatic -->]]></content:encoded>
			<wfw:commentRss>http://blog.testequipmentconnection.com/megger-best-practices-battery-maintenance-and-substation-seminars/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BlueChip Energy Starts Development of 10 MW Solar Farm</title>
		<link>http://blog.testequipmentconnection.com/bluechip-energy-starts-development-of-10-mw-solar-farm</link>
		<comments>http://blog.testequipmentconnection.com/bluechip-energy-starts-development-of-10-mw-solar-farm#comments</comments>
		<pubDate>Tue, 08 Jun 2010 13:55:46 +0000</pubDate>
		<dc:creator><![CDATA[Mike Novello]]></dc:creator>
				<category><![CDATA[Solar]]></category>
		<category><![CDATA[10 MW Solar Farm]]></category>
		<category><![CDATA[BlueChip Energy]]></category>
		<category><![CDATA[FL]]></category>
		<category><![CDATA[Fronius 60kW Inverters]]></category>
		<category><![CDATA[Lake Mary]]></category>
		<category><![CDATA[monocrystalline panels]]></category>
		<category><![CDATA[Rinehart Solar Farm]]></category>
		<category><![CDATA[Solar panels]]></category>

		<guid isPermaLink="false">http://blog.testequipmentconnection.com/?p=825</guid>
		<description><![CDATA[BlueChip Energy starts development of 10 MW solar farm in Florida BlueChip Energy, a provider of solar energy solutions for residential, commercial, government and utility applications, has started its stage one of the Rinehart solar farm, a 10MW utility-scale solar &#8230; <a href="http://blog.testequipmentconnection.com/bluechip-energy-starts-development-of-10-mw-solar-farm">Read More <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<h3>BlueChip Energy starts development of 10 MW solar farm in Florida</h3>
<p style="text-align: justify;"><img class="alignnone" src=" http://www.bluechipenergy.org/images/BlueChipEnergy_LogoTagline.png" alt="" width="500" height="84" /> BlueChip Energy, a provider of solar energy solutions for residential, commercial, government and utility applications, has started its stage one of the Rinehart solar farm, a 10MW utility-scale solar facility in Central Florida.</p>
<p style="text-align: justify;">The Rinehart solar farm project, located in Lake Mary, Fla, will have a total capacity of 10MW and an annual generation of approximately 1.5millionkw hours. This is equivalent to the annual energy use of roughly 1,100 area homes. It will cover a portion of the 380,000sqft rooftop space and surrounding acreage of BlueChip Energy&#8217;s Lake Mary facility.</p>
<p style="text-align: justify;">The solar farm is being built in stages. The first stage is expected to be completed by July, 2010. Stage two is a roof top plant consisting of 500 kW. Subsequent stages will consist of a third, 1.4 MW rooftop system and 8 MW of ground-based systems. (Source: Datamonitor)</p>
<p style="text-align: justify;"><img class="alignleft" src="http://www.bluechipenergy.org/images/references/Rinehart1a.jpg" alt="" width="308" height="169" /> Rinehart Solar Farm Lake Mary, FL &#8211; Stage one roof top plant 120kW</p>
<p style="text-align: justify;">Project features roof top and ground mount solar arrays for a utility scale solar plant covering a portion of 380,000 square foot roof top space and surrounding acreage. (source bluechipenergy.org)</p>
<p>* Completion: June 2010<br />
* System Size: 120kW<br />
* Number of solar panels: 520<br />
* Solar Technology: 230 Watt monocrystalline panels, Fronius 60kW Inverters<br />
* Green Fact: Prevents 138 metric tons of CO2 emission per year</p>
<!-- Start Shareaholic Recommendations Automatic --><!-- End Shareaholic Recommendations Automatic -->]]></content:encoded>
			<wfw:commentRss>http://blog.testequipmentconnection.com/bluechip-energy-starts-development-of-10-mw-solar-farm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
